Rapid construction

We industrialise building: components are manufactured off site while the foundations are being laid, then assembled in a matter of weeks.

2006DAQUAE founded
2011established in Africa
3countries of operation: France, Senegal, Guinea

Two projects that prove it

Technoland Park: time-lapse of the site
Precast concrete

Technoland Park: 6 levels in 16 weeks

Six-storey office building constructed with a precast concrete system.

Annobón Airport: the construction
Glued laminated timber

Annobón Airport: 11 weeks

Glued laminated timber construction of the terminal.

Three construction systems

The choice depends on the programme, the climate and the site logistics.

Precast concrete

Concrete panels and modules produced in a factory or an on-site plant. Robust, with high thermal inertia and durable in tropical climates.

Office buildings, housing and hotelsUp to G+10

Timber frame

Lightweight structures, quick to transport and erect, with a low carbon footprint. Suited to hotels, schools and housing.

Hangars, retail units, office buildings and housingUp to G+3

Steel frame

Steel frames fabricated and galvanised in the workshop, delivered in containers and then bolted on site. Long spans, rapid erection, demountable and adaptable buildings.

Warehouses, factories, hangarsOffices and retail units
Steel construction

Our projects in pictures

Technoland Park time-lapseSix office levels built in 16 weeks, from earthworks to handover.

Completed programmes

Hospitality

Tourism and business hotels, for independent establishments and international chains.

Housing & new towns

Residential districts and associated facilities, designed with integrated water and energy management.

Public buildings

Schools, health centres and administrative buildings delivered within public programme deadlines.

Why it is faster

  1. Parallel studies

    Design and manufacture start together.

  2. Off-site manufacture

    During earthworks and foundations.

  3. Assembly

    On-site erection by specialist teams.

  4. Handover

    Finishing works completed; networks, water and energy connected.